El Kontrol - Beginning
 
 
Year of AssignationName of ProjectContractor 
 
2014 Delivery of electrical equipment and implementation of electrical works for erection of Karlovo Biomass power plant at Stroevo Village EQTEC BULGARIA EOOD – branch of EQTEC Iberia, Spain details
2015 Installation of electrical heat-tracing to replace existing steam heat-tracing at LUKOIL Neftohim Burgas AD LUKOIL Neftohim Burgas AD details
2015 Delivery, installation and dismantle of 110 kV Power Circuit breakers and 110 kV Disconnectors at Mini Maritsa Iztok EAD Mini Maritsa Iztok EAD, Radnevo details
2015 Design and erection of two 20/6,3 kV, 10 МVА Step-down Movable Substations Mini Maritsa Iztok EAD, Radnevo details
2016 Recostruction, repair and modernization of Truction substations Burgas and Karnobat Energoremont Holding AD, Sofia details
2016 400/220/110 kV Substation Maritsa-iztok – reconstruction of 110 kV Switchyard Electricity System Operator EAD details
2016 Construction of 20 kV overhead line (OHL) from Gledachevo S-st to movable substation in Troyanovo-1 Mine Mini Maritsa Iztok EAD, Radnevo details