El Kontrol - Beginning
 
 
Name of Project: Installation of electrical heat-tracing to replace existing steam heat-tracing at LUKOIL Neftohim Burgas AD
   
Contractor: Installation of electrical heat-tracing to replace existing steam heat-tracing at LUKOIL Neftohim Burgas AD
   
Description:

Subject of this Project is substitution of existing steam heaters for industrial installations located at LUKOIL Neftohim Burgas AD, with electrical ones. Contract includes supply, installation and commissioning of all the equipment needed for construction of a new heating installation for over 5000 m pipeline and putting it into operational use.

Scope of activities:

  1. Dismantle of existing steam heaters;
  2. Supply of materials needed for erection of the new heat-tracing installation: cable trays, control cables, power cables, heating cables, electrical panels, local explosion-proof control boxes;
  3. Laying of specialized heating cables for electrical heat-tracing of technological and C&I equipment;
  4. Laying and connection of power and control cables;
  5. Construction of earthing installations;
  6. Manufacturing, installation and connection of power supply panels;
  7. Manufacturing, installation and connection of local manual-operated control and signalization boxes;
  8. Integration of heat-tracing control and signalization to the industrial installation DCS system;
  9. Installing new insulations;
  10. Commissioning and putting into operational use of the new heat-tracing installation.
   
Date of Assignation: 11.2015
   
 Activities:
   
Other:
All Projects  Gallery  Map of Project