Name of Project: Erection of Field No 18 in 220 kV outdoor switchgear at Maritsa East 2 TPP
   
Contractor: NEC EAD Electricity Distribution Enterprise
   
Description: Erection of Field No 18 in 220 kV outdoor switchgear at Maritsa East 2 TPP. The order has been assigned by NEC EAD Electricity Distribution Enterprise, Stara Zagora.
   
Lead in exploitation: 1999
   
Finished Activities:
▪ Installation of primary equipment: circuit breakers, power and current transformers, knife disconnectors, pipes;
▪ Installation of three-phase bus-duc
▪ Laying, tests and connection of control cables.
   