Name of Project: Replacement of 20 kV circuit breaker for main pump in Distribution and supply base Stara Zagora
   
Contractor: Lukoil Neftohim Burgas JSC
   
Description: 20 kV circuit breaker for main pump was replaced in Distribution and supply base Stara Zagora, Elenino Substation, 20 kV Indoor Switchgear
   
Lead in exploitation: 2004
   
Finished Activities:
▪ Dismantling of existing oil circuit breaker;
▪ Remake of existing
▪ Delivery and installation of 20 kV vacuum circuit breaker;
▪ Control and document of circuit breaker parameters.
   
Other: A reference for good performance has been given by the contractor Lukoil Neftohim Burgas JSC.