Name of Project: Erection, installation and commissioning of 6 kV and 0,4 kV Power Systems of Units 7-th and 8-th in Flue Gas Desulphurization Plant (FGD) - Maritsa East 2 TPP
   
Contractor: АВВ Utility Automation GmbH. Germany
   
Description: In year 2000 EL KONTROL won the recognition of АВВ Utility Automation GmbH. who was a Contractor for Erection of Flue Gas Desulphurization Plant (FGD) for Units 7-th and 8-th in Maritsa East 2 TPP. For the period 2000 - 2001 EL KONTROL implemented the electrical part of the FGD Project: installation the 6 kV and 0,4 kV indoor switchgears, installation of power transformers and power supply and commissioning the equipment installed.
   
Lead in exploitation: 2001
   
Finished Activities:
▪ Erection of cable trays for power and control cables;
▪ Laying of 0,4 kV and 6 kV power cables and connection with cable terminals;
▪ Installation of 0,4 kV and 6 kV cubicles;
▪ Installation of 6/0,4 kV transformers;
▪ Control tests and measurements of cables and motors; issuing Certificates for inspectiol.
   
Other: The accurate and up-to-date implementations of this order lead to the assignment of another contract with АВВ Utility Automation GmbH. A reference has been issued by АВВ Utility Automation GmbH. and Consortium INA/SHU as a proof for the prompt implementation of these orders.