Name of Project: Repair of concrete foundations of 400 kV Burgas Substation
   
Contractor: Electricity System Operator EAD
   
Description:

EL KONTROL started works for Repair of concrete foundations of the equipment in 110 kV Switchyard of 400 kV Burgas Substation.

This order is a part of the Project for rehabilitation and enlargement of 400 kV Burgas Substation, and it has been awarded to EL KONTROL by Power System Operator EAD.

The scope of activities includes:

- erection of concrete tables and foundations for the equipment in 110 kV Switchyard;
- construction of tubular grid of steel conduits.

   
Lead in exploitation: 2012
   