Name of Project: Substitution of 6 kV cables from First and Second Feeder to 6,3/0,4 kV Substation No. 220BH on the territory of LUKOIL Neftohim Burgas AD
   
Contractor: The contract was assigned by LUKOIL Neftohim Burgas AD
   
Description: Project concerns substitution of existing outdated cables and partial repair of cable trestle in 6,3/0,4 kV Substation No. 220BH on the territory of LUKOIL Neftohim Burgas AD
   
Lead in exploitation: 12.2013
   
Finished Activities:
  • Dismantle of existing 6 kV power cables;
  • Repair of existing steel structure;
  • Delivery, laying and connection of 6 kV power cables;
  • Delivery and installation of 6 kV cable ends and ferrules;
  • Commissioning works, phasing and testing of cables.
   