Name of Project: Elaboration and realization of design for Substitution of circuit breakers and disconnectors in 20 kV Indoor Switchgear at Oil-tank farm on the territory of LUKOIL Neftohim Burgas AD
   
Contractor: The contract was assigned by LUKOIL Neftohim Burgas AD
   
Description: Contract scope includes elaboration of detailed design (primary and secondary commutation) for reconstruction of existing 20 kV Indoor SWG into 20 kV air-insulated metal-clad SWG at 110/20/6 kV Substation No. 2 situated in Oil-tank farm Rosenets on the territory of LUKOIL Neftohim Burgas AD. Contract also includes further realization of the design, and commissioning of the equipment installed.
   
Lead in exploitation: 12.2013
   
Finished Activities:
  • Elaboration of detailed design for reconstruction of existing 20 kV Indoor SWG at 110/20/6 kV Substation No. 2. Design includes Electrical part, Construction part, and Architectural part;
  • Dismantle of equipment from 20 kV Indoor SWG: circuit breakers, disconnectors, measuring transformers, metal structure, and busbar system with adjacent support insulators;
  • Reconstruction works: plastering, painting, floor repair;
  • Installation Lighting system;
  • Delivery and installation of 20 kV air-insulated metal-clad SWG;
  • Delivery, laying and connection of power cables and control cables;
  • Reconstruction of trade metering panel; reconstruction of signalization panel; assembly and installation of control metering panel;
  • Commissioning works and put of all the equipment installed under operational use.
   
Other: