Name of Project: Alternation of the power supply scheme of 6/0.4 kV Substation No.214 to direct power supply from 6 kV Indoor Switchgear of Main step-down Substation GPP-2, first and second section
   
Contractor: LUKOIL Neftohim Burgas AD
   
Description:

Substation No.214 is located on the territory of LUKOIL Neftohim Burgas AD oil processing company.

The Project concerns provision of a direct power supply of the Substation from 6 kV Indoor Switchgear of Main step-down Substation, load distribution between Substation No. 214 and Substation 215, set-up of relay protection and microprocessor protection, installation of new electrometers for the incoming feeders of Substation No. 214.

   
Lead in exploitation: 03.2014
   
Finished Activities:

Finished activities:

  1. Dismantle of existing power cables.
  2. Dismantle of cable racks.
  3. Supply, laying and connection of power cables.
  4.  Delivery and installation of electrometers.
  5.  Painting and corrosion protection of steel structures.
  6.  Set-up of relay protection.
  7.  Control tests and commissioning of Substation 214.
   
Other: