Name of Project: Implementation of Substation Automation System (SAS) for 220/110 kV Switchyard of Varna TPP
   
Contractor: Efacec Engenharia S.A. – Branch Bulgaria
   
Description:

Construction of SAS for 220/110 kV Switchyard of Varna TPP is part of the Project for modernization of the Power Plant.
Construction site is located in Ezerovo Village, Varna Region, Bulgaria.

   
Lead in exploitation: 09.2015
   
Finished Activities:
  • Laying and connection of control cables;
  • Installation of secondary commutation, tests and commissioning of SAS;
  • Production and installation of 26 protection and control panels;
  • Supply of electrical materials for reconstruction of existing panels.
   