Name of Project: Reconstruction of substation 209A and shifting the power supply of active equipment in LUKOIL Neftohim Burgas AD
   
Contractor: LUKOIL Neftohim Burgas AD
   
Description: Subject of this Project is modernization of S-st 209A situated on the territory of LUKOIL Neftohim Burgas AD oil refinery, by means of substitution of outdated and unreliable equipment. The purpose of the reconstruction is to be provided flawless and reliable power supply of the installations energized by this Substation.
   
Lead in exploitation: 11.2015
   
Finished Activities:
  1. Dismantle of existing equipment;
  2. Supply, pulling and connection of power cables;
  3. Construction activities: painting, plastering, anticorrosive protection, ground-coating;
  4. Supply and installation of steel structures – cable trestles;
  5. Manufacturing and installation of distribution boards.
   