Name of Project: Implementation of Engineering, deliveries and installation of lighting system in the Gypsum Desulphurization Plant (GDP) - Maritsa East 2 TPP, and also Installation of 0.4 kV and 6kV cubicles
   
Contractor: АВВ Utility Automation GmbH. Germany
   
Description: The accurate and up-to-date implementations of this order lead to the assignment of another contract with АВВ Utility Automation GmbH. At the end of 2002. EL KONTROL EOOD was assigned for implementation of Engineering, deliveries and installation of lighting system in the Gypsum Desulphurization Plant (GDP) - Maritsa East 2 TPP, and also Installation of 0.4 kV and 6kV cubicles.
   
Lead in exploitation: 2003
   
Finished Activities:
▪ Design and erection of Lighting installation;
▪ Erection of cable racks for power and control cables;
▪ Laying of 0,4 kV and 6 kV power cables and connection with cable terminal;
▪ Laying and connection of 0,4 kV and 6 kV control cables;
▪ Control tests and measurements of cables and motors; issue of Certificates for inspection, commissioning of the electrical equipment.
   
Other: A reference has been issued by АВВ Utility Automation GmbH. and Consortium INA/SHU as a proof for the prompt implementation of these orders.