Name of Project: Substitution and commissioning of low-oil measuring transformers in 110 kV Indoor Switchgear of main step-down substation GPP-2 in LUKOIL Neftohim Burgas AD
   
Contractor: LUKOIL Neftohim Burgas AD
   
Description:

Project includes implementation of electrical installation works and supply of equipment for substitution of 110 kV low-oil measuring transformers with SF6 ones, and their commissioning. Place of work is Indoor Switchgear of main step-down substation GPP-2 in LUKOIL Neftohim Burgas AD oil refinery.

   
Lead in exploitation: 03.2016
   
Finished Activities:
  1. Making and installing steel structures;
  2. Dismantle of measuring transformers and three-phased conductor deviations;
  3. Supply of 110 kV current measuring transformers;
  4. Substitution of low-oil measuring transformers with SF6 ones, installing three-phased conductor deviations and connections;
  5. Supply, pulling and connection of control cables;
  6. Control tests and commissioning of 110 kV measuring transformers.
   