Name of Project: Reconstruction and extension of 400 кV Outdoor Switchgear in Maritsa East 3 TPP as a part of a 400 кV power distribution line from Maritsa East 3 TPP to substation "Alibeikjoi" (Turkey)
   
Contractor: NEC EAD Trafoelektroinvest State Enterprise
   
Description: SUBPROJECT: Existing 0.4 kV Switchgear
   
Lead in exploitation: 2003
   
Finished Activities:
▪ Dismantle of existing 0.4 kV cubicles;
▪ Delivery, installation and commissioning of 0,4 kV cubicles;
▪ Substitution of control and power cables;
▪ Control tests and measurements of power equipment and relay protection.
   
Other: It has been awarded to EL KONTROL by NEC EAD Trafoelektroinvest State Enterprise after a Public Procurement Competition had been carried out.