2016 2016 Substitution and commissioning of low-oil measuring transformers in 110 kV Indoor Switchgear of main step-down substation GPP-2 in LUKOIL Neftohim Burgas AD LUKOIL Neftohim Burgas AD details
2015 2016 Reconstruction and enlargement of 220 kV Switchyard at S-st Pleven-1 –implementation of turnkey project for design, construction, supply of equipment, electrical installation and commissioning Electricity System Operator EAD details
2015 2015 Reconstruction of 110 kV relay protection in main step-down substation GPP-2 and opposite main step-down substations in LUKOIL Neftohim Burgas AD LUKOIL Neftohim Burgas AD details
2015 2015 Design, supply of equipment for 6 kV Substation, dismantle of existing equipment, installation, tests and commissioning at Oil-tank farm Rosenets on the territory of LUKOIL Neftohim Burgas AD LUKOIL Neftohim Burgas AD details
2015 2015 Repair of cable trestles, mast lighting, and repair of panels in LUKOIL Neftohim Burgas AD LUKOIL Neftohim Burgas AD details
2015 2015 Power supply of Distribution Substation in Neochim PLC. from 6 kV Main Distribution Substation in Maritsa-3 TPP, Dimitrovgrad Neohim PLC. details
2015 2015 Reconstruction of substation 209A and shifting the power supply of active equipment in LUKOIL Neftohim Burgas AD LUKOIL Neftohim Burgas AD details
2015 2015 Implementation of Substation Automation System (SAS) for 220/110 kV Switchyard of Varna TPP Efacec Engenharia S.A. – Branch Bulgaria details
2014 2015 Elaboration of detailed design for repair and rehabilitation of rectifier stations (RS). Rehabilitation of RS in Stara Zagora Troleybusni prevozi EOOD Stara Zagora details
2014 2015 Maintenance of lighting installations in Contour Global Maritsa East 3 TPP Contour Global Maritsa East 3 AD details