Year of AssignationLead in ExploitationName of ProjectContractor 
 
1 2 3 4 5 6 7 8 
2015 2016 500/220 kV Substation JVARI near the town of Zugdidi, Georgia Efacec Contracting Central Europe GmbH details
2016 2017 Delivery, installation and commissioning of electrical equipment for compensation of reactive power of the heavy industrial mining equipment at Mini Maritsa-Iztok – Troyanovo-1 and Troyanovo-3 Mines Siemens EOOD details
2015 2016 Installation of electrical heat-tracing to replace existing steam heat-tracing at LUKOIL Neftohim Burgas AD Installation of electrical heat-tracing to replace existing steam heat-tracing at LUKOIL Neftohim Burgas AD details
2015 2016 Delivery, installation and dismantle of 110 kV Power Circuit breakers and 110 kV Disconnectors at Mini Maritsa Iztok EAD Mini Maritsa Iztok EAD, Radnevo details
2016 2016 Substitution and commissioning of low-oil measuring transformers in 110 kV Indoor Switchgear of main step-down substation GPP-2 in LUKOIL Neftohim Burgas AD LUKOIL Neftohim Burgas AD details
2015 2016 Reconstruction and enlargement of 220 kV Switchyard at S-st Pleven-1 –implementation of turnkey project for design, construction, supply of equipment, electrical installation and commissioning Electricity System Operator EAD details
2015 2015 Reconstruction of 110 kV relay protection in main step-down substation GPP-2 and opposite main step-down substations in LUKOIL Neftohim Burgas AD LUKOIL Neftohim Burgas AD details
2015 2015 Design, supply of equipment for 6 kV Substation, dismantle of existing equipment, installation, tests and commissioning at Oil-tank farm Rosenets on the territory of LUKOIL Neftohim Burgas AD LUKOIL Neftohim Burgas AD details
2015 2015 Repair of cable trestles, mast lighting, and repair of panels in LUKOIL Neftohim Burgas AD LUKOIL Neftohim Burgas AD details
2015 2015 Power supply of Distribution Substation in Neochim PLC. from 6 kV Main Distribution Substation in Maritsa-3 TPP, Dimitrovgrad Neohim PLC. details