Burgas
Project:
Rehabilitation of substation Burgas - substitution of equipment in the present 400 кV Open-yard Switchgear, enlargement of 400 кV Open-yard Switchgear, substitution of 110 кV, 31,5 кV and 20 кV circuit-breakers - dismantling, electrical installation and construction works

Contractor:
ETRA-EL EOOD

Statute:
implemented /2011

project implemented current


Project:
Reconstruction of the 110kV Switchyard on Substation ‘Slaveykov’ envisages substitution of the outdated equipment and reinforced concrete structures in the 110 kV Switchyard, along with that a new field for 110 kV outgoing cable line is planned to be erected

Contractor:
National Electric Company EAD

Statute:
implemented /2012

project implemented current


Project:
Repair of concrete foundations of 400 kV Burgas Substation

Contractor:
Electricity System Operator EAD

Statute:
implemented /2012

project implemented current


Project:
Manufacturing, engineering, erection and set-up of cabinets and panels with relay protection for 220кV and 400кV Switchgears of The National Electric Company

Contractor:
Contractor: El-Test Ltd., Client: National Electric Company EAD

Statute:
implemented /2010