El Kontrol - Beginning
 
 
Kazanlak
Project:
Erection of trade measuring of electrical power consumed by Kaproni Plc., Kazanlak

Contractor:
National Electric Company EAD

Statute:
implemented /2008

project implemented current


Project:
Repair of motor drives of disconnectors - 110/20kV, Sahrane Substation

Contractor:
NEC EAD High Voltage Network Enterprise, Power Transmission Region Stara Zagora

Statute:
implemented /2003

project implemented current


Project:
Repair of motor drives for control cables - 110/20kV, Sahrane Substation

Contractor:
NEC EAD High Voltage Network Enterprise, Power Transmission Region Stara Zagora

Statute:
implemented /2003

project implemented current


Project:
Electrical installation and commisssioning activies - "M + S Hydraulic" Kazanlak

Contractor:
"M + S Hydraulic" Kazanlak

Statute:
implemented /2004

project implemented current


Project:
Repair of secondary wiring of 110kV field in Sahrane Substation

Contractor:
NEC EAD High Voltage Network Enterprise, Power Transmission Region Stara Zagora

Statute:
implemented /2004

project implemented current


Project:
Manufacturing, engineering, erection and set-up of cabinets and panels with relay protection for 220кV and 400кV Switchgears of The National Electric Company

Contractor:
Contractor: El-Test Ltd., Client: National Electric Company EAD

Statute:
implemented /2009

project implemented current