Lukoil
Project:
Reconstruction and modernization of Main Step-down Substation 2 (GPP-2) 110/15.75/6.3 kV on the territory of LUKOIL Neftohim Burgas AD

Contractor:
The contract was assigned by LUKOIL Neftohim Burgas AD

Statute:
implemented /2013

project implemented current


Project:
Substitution of 6 kV cables from First and Second Feeder to 6,3/0,4 kV Substation No. 220BH on the territory of LUKOIL Neftohim Burgas AD

Contractor:
The contract was assigned by LUKOIL Neftohim Burgas AD

Statute:
implemented /2013

project implemented current


Project:
Elaboration and realization of design for Substitution of circuit breakers and disconnectors in 20 kV Indoor Switchgear at Oil-tank farm on the territory of LUKOIL Neftohim Burgas AD

Contractor:
The contract was assigned by LUKOIL Neftohim Burgas AD

Statute:
implemented /2013

project implemented current


Project:
Alternation of the power supply scheme of 6/0.4 kV Substation No.214 to direct power supply from 6 kV Indoor Switchgear of Main step-down Substation GPP-2, first and second section

Contractor:
LUKOIL Neftohim Burgas AD

Statute:
implemented /2014

project implemented current


Project:
Reconstruction and modernization of 6 kV Switchgear in Substation No. 209

Contractor:
LUKOIL Neftohim Burgas AD

Statute:
implemented /2014

project implemented current


Project:
Reconstruction of external power supply of Substation 208 HV

Contractor:
LUKOIL Neftohim Burgas AD

Statute:
implemented /2014

project implemented current


Project:
Reconstruction of substation 209A and shifting the power supply of active equipment in LUKOIL Neftohim Burgas AD

Contractor:
LUKOIL Neftohim Burgas AD

Statute:
implemented /2015

project implemented current


Project:
Repair of cable trestles, mast lighting, and repair of panels in LUKOIL Neftohim Burgas AD

Contractor:
LUKOIL Neftohim Burgas AD

Statute:
implemented /2015

project implemented current


Project:
Design, supply of equipment for 6 kV Substation, dismantle of existing equipment, installation, tests and commissioning at Oil-tank farm Rosenets on the territory of LUKOIL Neftohim Burgas AD

Contractor:
LUKOIL Neftohim Burgas AD

Statute:
implemented /2015

project implemented current


Project:
Reconstruction of 110 kV relay protection in main step-down substation GPP-2 and opposite main step-down substations in LUKOIL Neftohim Burgas AD

Contractor:
LUKOIL Neftohim Burgas AD

Statute:
implemented /2015

project implemented current


Project:
Substitution and commissioning of low-oil measuring transformers in 110 kV Indoor Switchgear of main step-down substation GPP-2 in LUKOIL Neftohim Burgas AD

Contractor:
LUKOIL Neftohim Burgas AD

Statute:
implemented /2016

project implemented current


Project:
Installation of electrical heat-tracing to replace existing steam heat-tracing at LUKOIL Neftohim Burgas AD

Contractor:
LUKOIL Neftohim Burgas AD

Statute:
current /2015

project implemented current