In March 2015 EL KONTROL started implementation of two new projects: Substation Pleven-1 in the town of Pleven, and Oil-tank farm (OTF) Rosenets on the territory of LUKOIL Neftohim Burgas AD

Read more ...

Contract for Design, supply of equipment for 6 kV Substation, dismantle of existing equipment, installation, tests and commissioning at OTF Rosenets includes elaboration of detailed design for substitution of 6 kV Switchgear with a new one equipped with vacuum circuit breakers, current transformers, microprocessor protection, and dry voltage transformers. Design also includes Secondary commutation part: control, signalization, protection, metering, automatic load transfer (ALT).

 

EL KONTROL started implementation of electrical works for the Project modernization of Varna TPP

Read more ...

Company is awarded to install Substation Automation System (SAS) for 220/110 kV Switchyard of Varna TPP inclusive of producing protection and control panels, and supply of electrical materials for reconstruction of existing panels. Construction site is located in Ezerovo Village, Varna Region, Bulgaria.

A common presentation by EL KONTROL and ABB Bulgaria was held on 20.11.2014 at the business premises of EL KONTROL in Stara Zagora. The event featured Specific characteristics of Emax2 air-insulated Circuit breakers, and Solutions and innovations of ABB r

Read more ...

Dipl. Eng. Stefan Yankov from ABB presented the innovative technological advantages of Emax2 air-insulated Circuit breakers.

ABB solution here is related to direct connection of the breakers to automation systems and energy management systems, as well as improvement of the productivity and the energy efficiency. Thanks to its novelty, aesthetics, high quality, applicability, functionality and productive efficiency this solution has showed to be excellent and won the Red Dot 2014 Design Award. Dipl. Eng. Yankov also presented ArTu type-tested panels giving examples for their certain application in various industrial enterprises.

 

EL KONTROL started works for Reconstruction and modernization of 6 kV Switchgear in Substation No. 209 located on the territory of LUKOIL Neftohim Burgas AD

Read more ...

Scope of the contract includes elaboration of a detailed design for substitution of outdated 6 kV Switchgear with a new one equipped with vacuum circuit breakers.

Furthermore design includes DC panel and secondary commutation part: control, signalization, protection, automation, and metering.

Substitution of 20 kV distribution Switchgear in 20/6/0.4 kV Substation PS Maritsa at Neochim PLC - project was assigned to EL KONTROL by Neochim PLC

Read more ...

20/6 kV Substation at Pump Station (PS) Maritsa is a part of the power system of Neochim PLC chemical plant in Dimitrovgrad providing electricity for the technological and production cycle of the plant. 

The 20 kV and the 6 kV Switchgears (SWGs) of the Substation are furnished with outdated equipment under many years of exploitation causing frequent failures which disturb the fluency of production cycle in the plant.