Assignor:
Neochim AD
Location:
Dimitrovgrad
Assigned: 2017 / Completed: 2017
Project description
Order implementation takes place in Neochim AD chemical plant, Dimitrovgrad. It concerns substitution of outdated equipment – two input circuit breakers and one section circuit breaker, due to their removal from operational use.
Activities
- Revision of existing 0.4 kV switchboards – retrofit of circuit breakers by substitution with new air-insulated ones, type 3WL1, Siemens make. Total number of 0.4 kV circuit breakers installed – 3 units.
- Installation of new Siemens circuit breakers of the following types:
- Two units of 2500A, 55 kA, input circuit breakers, size 2, with motor drive, draw-out type, vertical conductive terminals with electronic protection.
- One units of 1600 А, 55 kA, section circuit breaker, size 2, with motor drive, draw-out type, vertical conductive terminals with electronic protection.