Assignor
Electricity System Operator EAD – Burgas Network Operating District (ESO EAD – Burgas NOD)
Location
Malko Tarnovo, Region of Burgas
Assigned: March, 2020/ Completed: July, 2020
Project includes completion of works for reconstruction of Control-and-administrative Building, and Indoor Switchgear in S/st Malko Tarnovo, as following:
• Reconstruction of the facade of Control-and-administrative Building, by installing external thermal insulation and replacement of joinery.
• Reconstruction of the facade of Indoor Switchgear, by installing external thermal insulation, replacement of joinery.
• Internal renovation of the premises at Indoor Switchgear - plastering, painting and flooring.
• Repair of two cable shafts and a pavement near Indoor Switchgear.
• Complete renovation of the premises on the second floor of the Control-and-administrative building, by replacement of plumbing, repair of bathrooms, installing new internal sewerage, faience tiles, replacement of sinks, faucets and shower faucets.