Reconstruction of 110kV switchgear in LUKOIL Neftohim Burgas AD

Assignor:
LUKOIL Neftohim Burgas AD

Location:
Burgas, Region of Burgas

Date of assignment: August, 2023/ Completion date: september, 2024

This project is located in LUKOIL Neftohim Burgas AD and includes two lots:

  1. Elaboration of detailed design and substitution of 110kV circuit breakers
  2. Elaboration of detailed design and substitution of 110kV oil-filled metering transformers.

Scope awarded of activities:

Lot 1

- Elaboration of detailed design for substitution of 110kV circuit breakers

- Dismantling of existing 110kV circuit breakers and installation of new 110kV SF6 circuit breakers made by SIEMENS

- Primary wiring between circuit breakers and existing facilities

- Supply and installation of control cables

- Repair and reconstruction of reinforced concrete structures

- Reconfiguration of relay protection

- Preparation of as-built documentation

Lot 2

- Elaboration of detailed design for substitution of 110kV oil filled metering transformers

- Dismantling of existing 110kV transformers, supply and installation of new 110kV SF6 transformers, type SVAS 123

- Construction of new concrete foundations

- Fabrication and installation of steel support structures

- Repair and construction of cable routes

- Supply and installation of control cables

- Control tests and commissioning

- Preparation of as-built documentation