Assignor:
Lukoil Neftohim Burgas JSC
Location:
Stara Zagora
Assigned: 2004 / Completed: 2004
Project description
Order concerns substitution of 20 kV circuit breaker for main pump in Oil-Supply Farm Stara Zagora at Elenino Substation, 20 kV Indoor Switchgear.
Activities
- Dismantle of existing oil circuit breaker;
- Reconstruction of carrier, sockets, control circuits, signalization, interlock, schematic diagrams; check-up of relay protection;
- Delivery and installation of 20 kV vacuum circuit breaker;
- Control and documentation of circuit breaker parameters.