Substitution of 20 kV circuit breaker for main pump in Oil-supply Farm Stara Zagora

Assignor:
Lukoil Neftohim Burgas JSC

Location:
Stara Zagora

Assigned: 2004 / Completed: 2004

Project description

Order concerns substitution of 20 kV circuit breaker for main pump in Oil-Supply Farm Stara Zagora at Elenino Substation, 20 kV Indoor Switchgear.

Activities

  • Dismantle of existing oil circuit breaker;
  • Reconstruction of carrier, sockets, control circuits, signalization, interlock, schematic diagrams; check-up of relay protection;
  • Delivery and installation of 20 kV vacuum circuit breaker;
  • Control and documentation of circuit breaker parameters.

 

 

 Reference